DRAFT MODE ACTIVE

Aurizon Traction Load Study 

Aurizon Traction Load Study

Project Description

Aurizon is one of the world’s largest heavy-haul railways. A significant portion of Aurizon’s railway has been electrified since the 1980s with numerous substations reaching end of life and requiring refurbishment. 
Incite Energy was engaged to conduct a network modelling study and simulation to determine the network limitations associated with substation refurbishment. 

Key Achievements 

A dynamic load flow study was conducted to determine the extent of traffic which would be achievable while various substations are out of service for refurbishment. 

Share this project

iconiconicon
Alt text

Get in touch with us today

Join over 200+ companies already working with Incite Energy for their renewable energy solutions

Contact Us